Technical consultancy contract for development up to RtB status
Pestera locality, Constanta county
Installed capacity: 396 MW
Connection: TSO transport grid
Client: RADRAMO POWER
Technical consultancy contract for development up to RtB status
Cernisoara locality, Valcea county
Installed capacity: 20 MW
Connection: DSO distribution grid
© 2022 ERRA Renewables - All Rights Reserved.